Deutsch (DE-CH-AT)English (United Kingdom)

Search

Messages

Technical parts inductive welding

Machine system IMT 1 – basis equipment and option

Machine features:
- Time welding
- Way welding with sensor contact and exact adjustment
- Pressure adjustment via exact pressure controller
- Pneumatic compact control system with weight compensation
- Limit stop
- Heavy load guide rollers
- Aligning groove in part-pick up space

Process features:
- Noiseless
- Plastic material-metal joining
- Imbed
 -Process time 1-3 sec.
- High efficiency reserves
- Joining precision in 0,02 steps
- Automatizeable

     
              Inductive element                            IMT - inducitve machine

By help of a coil disposed in a distance of the product,
 a metal structure in the plastic material part is heated
up in split seconds without contact.
The efficiency is precisely programable.

EXAMPLE- Between box and cover an electrical conductive means (screen) is placed in, which serves as resistance for the alternating stress.
It brings the plastic material to the necessary melting temperature.
At a good exposition of the joining zone the melting formation takes place mostly without conclusion of the oxygen resulting in a high welding factor.

  

                 Before welding                                        Optimale welding

Contacts

 

  • welding your parts? 

They have "technical parts" and will know, if these parts can be welded, than send us a Email with your drawings and picuters of the parts.

 

 

  • Representation?

We work "direct" in die whole world. 

 

We have representation in Italy: Raima s.r.l 

 

 

 

 

Fischer Kunststoff-Schweißtechnik GmbH

Meißnerstraße 5
D-37297 Berkatal

Tel. 0 56 57 91 30 21

Fax 0 56 57 82 65

email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it.

 

 

Our contacts: 

1 Willi Fischer Business Leadership
2 Michael Fischer Attorney
3 Silke Zengerling Purchase and Sales
4 Markus Oels Project Management
5 Volker Wierhake Construction
6 Michael Meinhardt Service and Installation
7 Thomas Werlich Technical Documentation - IT area